Super Mid-Wilshire Studio w/Gym, Pool, Spa & Roof Lounge, by Blueground | Apartment in Los Angeles

1 Bedroom Apartment in Greater Wilshire - Hancock Park, Los Angeles
Show up and start living from day one in Los Angeles with this sophisticated studio Blueground apartment. You’ll love coming home to this thoughtfully furnished, beautifully designed, and fully equipped Mid-Wilshire home. (ID #LAX1222)
Designed with you in mind
Thoughtfully designed with bespoke finishes, modern furnishings, and a fully equipped kitchen, you’ll enjoy that “I’m home” feeling with this Blueground apartment. Whether you’re lounging in your beautiful living room streaming the latest and greatest entertainment on the smart TV or premium wireless speaker, or getting some well-earned rest on the superior quality mattress with luxury linens, you’ll fall in love with everything this Mid-Wilshire apartment has to offer. This apartment also offers in-apartment laundry.
Sleeping arrangements
King Bed, 70.8in/180cm
Amenities
Building amenities unique to this studio apartment include an on-site:
- BBQ Area
- Dryer
- Elevator
- Swimming pool
- Washing machine
- Parking
- Pets allowed
Arrival and ongoing support
The entire apartment is yours to enjoy!
Throughout your stay, you’ll have access to our Client Experience team through the Blueground App. You can schedule additional cleanings, submit maintenance requests, and view our neighborhood recommendations with just a few taps.
We’ll share all details upon confirmation of your stay.
Ideally Located
This furnished rental is located in Mid-Wilshire. Often referred to as Midtown by L.A. locals, the neighborhood is a diverse, centrally located district with several museums, including the renowned Los Angeles County Museum of Art (LACMA). The stretch of Little Ethiopia on Fairfax Avenue offers traditional eateries and Pico Boulevard has taquerías and soul-food cafes. Santa Monica and the Hollywood Walk of Fame are both just a 20-minute ride away.
Other things to note
Building amenities may have an extra cost.
This Blueground apartment has flexible lease options, allowing you to book it for one month, a year, or more.
Pets are welcome, though weight limits and breed restrictions apply and may incur fees.
Parking is offered based on availability and is subject to a fee.
We take great pride in ensuring every photo displayed is shot in our own units with our actual furnishings. That said, we regularly refresh our decor and furniture arrangement, which may differ from what’s pictured.
A security deposit of $500 is required at booking, which will be returned within 2-4 weeks after the check-out, minus any deductible damages.
Super Mid-Wilshire Studio w/Gym, Pool, Spa & Roof Lounge, by Blueground is located in Greater Wilshire - Hancock Park. Super Mid-Wilshire Studio w/Gym, Pool, Spa & Roof Lounge, by Blueground provides accommodation, featuring Fireplace/Heating, Air Conditioner, Pet Friendly, among other amenities. This Apartment features Fireplace/Heating, Air Conditioner, Pet Friendly, to make your stay a comfortable one.
Super Mid-Wilshire Studio w/Gym, Pool, Spa & Roof Lounge, by Blueground has 1 Bedroom , 1 Bathroom, and max occupancy of 2 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have rated it 2, and VRBO labeled it a top-rated Apartment because of the excellent services rendered by the owner or manager of this Apartment, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. Apartment has a friendly neighborhood, and the Greater Wilshire - Hancock Park has interesting places to visit. If you want to learn more about the Apartment in Greater Wilshire - Hancock Park, such as places to visit and things to do nearby, you can check below to learn more.
Amenities
Facility Overview
-
Heating
-
Air conditioning
-
1 bathroom
-
Hair dryer
-
Towels provided
-
Bed sheets provided
-
Living room
-
Oven
-
Coffee/tea maker
-
Stovetop
-
Microwave
-
Dishwasher
-
Refrigerator
-
Cookware/dishes/utensils
-
Washing machine and dryer
-
Laundry facilities
-
Onsite parking
-
Pet friendly
-
Elevator
-
Smoke-free property
-
Fitness center
-
TV
-
Stereo
-
Unit size: 553 sq ft (51 sq m)
-
Greek
-
English
-
Iron/ironing board
-
Housekeeping (on request)
-
WiFi available
-
Barbecue grill
-
Balcony
-
Smoke detector not reported (host has not indicated whether there is a smoke detector on the property)
-
Carbon monoxide detector not reported (host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector)
-
Shared/communal pool
Policies
Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector with you on the trip host has not indicated whether there is a smoke detector on the property onsite parties or group events are strictly prohibited special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation